[!--temp.baidutongji--]
Publish: 2022-01-07 16:10:16
Views:
Modern production not only pursues production and finished product quality, but also develops toward environmental protection. Especially in the comminution industry, the overall development trend of PIN CRUSHER OF PYROLYSIS Cinder technology in China is to stably develop, highly controllability, high quality and other stable development.
PIN CRUSHER OF PYROLYSIS Cinder is to generate speed, collide with each other, or collide with the target to achieve a pulverization effect.
Generally, the high-speed airflow accelerated pulverized solid particles have the following three ways:
(1) Airflow particles accelerate nozzle: After the airflow and the particles are mixed, the particles can be obtained. Very high speed (almost the same speed of airflow speed), but the material wears in the nozzle in the nozzle, rarely used in practical applications.
(2) Syringe Acceleration Particles: High Speed \u200b\u200b(Ultrasonic Speed) airflow and particles mix accelerate in the mixing tube, the particles obtain a higher speed, but the material is severe to the mixing tube.
(3) Free airflow acceleration particles: particles enter the high-speed airflow in the form of freely drop, only the high-speed air flow is passed through the nozzle and the wear is small.
ALPA Carbon PIN CRUSHER OF PYROLYSIS Cinder Case Sharing: The company produces supermatch and super fine pulverized in the production of static pressure graphite. After many examinations and experiments, finally selected our AlPA as a cooperative customer, we provide the Pin Crusher of PyrolySis Cinder provided to its daily need for carbon pulverity, particle size, yield and other needs.
Technical parameters:
Production capacity: 800-1000kg
Installation considerations for Pin Crusher of Pyrolysis Cinder
1, Host equipment such as machine, fan, etc.
3, the mounting grading wheel should strictly prevent collision, classify the host, and the fan should be tested, and the level is specified by the gasket, and there is a basic requirements and the foundation fixation.
4, require the sealing pipe interface to configure the sealing gasket.
5, after the layout machine is installed, first observe the direction of grading motor.
6, electric control cabinet installationWhen the line is checked, the corresponding relationship between the terminal sequence number and the device is carefully verified.
7. After the installation is completed, the first empty car is running 1-2 hours, and it is easy to securely check the accuracy and coordination of the equipment action at any time.
If there is related requirements, please call us!
Previous: Rod Pin Mills of Ammonium chloride
E-mail: marketing@alpapowder.com
Add.: No.168, Wenhua Road, Advanced Manufacturing Industrial Park, Anqiu, Weifang City, Shandong Province, China.
Copyright © 2000-2019 | Shandong Alpa Powder Technology Co., Ltd. All rights reserved | Sitemap